Wallker M-SP

Wallker M-SP has a loading capacity of 150 kg. Its energy is supplied by pressurized air passing through a hose connected to the platform.

Wallker M-SP has a loading capacity of 150 kg. Its energy is supplied by pressurized air passing through a hose connected to the platform. The length of the hose is determined according to the working area. While Wallker M-SP moves upward-downward and turns the wheels with the help of a joystick, it moves forward-backward with the help of a joystick and a foot switch. The foot switch allows for a more efficient operation as it enables the operator to control the forward-backward moves. Our Wallker M-SP Pneumatic Personnel Platforms are CE-certified and ATEX-approved. CE and ATEX approvals have been given by a global independent agency, TUV Austria.